Supply and pouring of reinforced concrete for the building, including the installation of the steel structure for the factory. It encompasses both structural and architectural design, along with the preparation of all plans.
Project Name
COPPER ROD MILL FACTORY
Work Location
Bahrah – Mecca
Owner/Contractor
Bahra Advanced Cable Manufacture
supply and pouring of reinforced concrete for the building, including the installation of the steel structure for the factory. It encompasses both structural and architectural design, along with the preparation of all plans
Project Name
NEW CV LINE
Work Location
Bahrah – Mecca
Owner/Contractor
Bahra Advanced Cable Manufacture
Supply and pouring of reinforced concrete for the building, including the installation of the steel structure for the factory It encompasses both structural and architectural design, along with the preparation of all plans
Project Name
Warehouses
Work Location
Riyadh – Dammam
Owner/Contractor
Agility Logistics Parks
Installation of the steel structure for mezzanine buildings, including the supply and installation of reinforced concrete slabs.
Project Name
IKEA
Work Location
Taif
Owner/Contractor
EHTERAF Real Estate Development
Finishings, electrical, and mechanical works
Project Name
Tam Tower
Work Location
Riyadh
Owner/Contractor
Ragoub Contracting Company
Installation of the steel structure – Fire-resistant coatings
Project Name
Al-Malouh Law Firm
Work Location
Jeddah
Owner/Contractor
Mr. Muhammed Malouh Al-Qahtany
Decoration, Interior design, comprehensive finishing, electrical, and mechanical work.
Project Name
Nupco Warehouse
Work Location
Dammam
Owner/Contractor
Creet International Contracting Company
Installation of the steel structure and roofing panels.
Project Name
Construction of PVH HARDWARE Factory
Work Location
Second Industrial City – Jeddah
Owner/Contractor
PVH HARDWARE Factory
Complete construction works (reinforced concrete works,
electrical works, mechanical works)
Project Name
PVH HARDWARE Company Administrative Offices
Work Location
King Road Tower – Jeddah
Owner/Contractor
PVH HARDWARE Company
Complete finishing works and decorations, including electrical and mechanical works
Project Name
Sami Defense Industries Company Factory
Work Location
Al Kharj City
Owner/Contractor
Sami Defense Industries
Installation of steel structure with covering panels
Project Name
Finishing of Al-Diwaniyah Construction Company Offices
Work Location
Jeddah – Al-Khalidiyah District
Owner/Contractor
Al-Diwaniyah Construction Company Offices
Complete finishing works and decorations, including electrical and mechanical works
Project Name
Installation of Steel Structure for Gulf Laboratories Building (Height: 45m)
Work Location
Dammam
Owner/Contractor
Gulf Laboratories Building
Installation of steel structure and covering panels for a building with a height of 45 meters
Project Name
Installation of Steel Structure for the Passenger Terminal Building at Al-Jawf Airport
Work Location
Sakaka, Al-Jawf
Owner/Contractor
Passenger Terminal Building at Al-Jawf Airport
Installation of steel structure for the new passenger terminal at the airport
Project Name
Installation of Steel Structure for Al-Eissai Factory – Jeddah – Second Industrial City
Work Location
Jeddah – Second Industrial City
Owner/Contractor
Al-Eissai Factory
Project Name
Installation of Steel Structure for Al-Nahdi Company Warehouse
Work Location
Jeddah – Second Industrial City
Owner/Contractor
Al-Nahdi Company Warehouses
Project Name
Finishing, Electrical, and Mechanical Works for Al-Waha Rest Buildings
Work Location
Jeddah – Dhahban
Owner/Contractor
Bugshan Holding Company
Project Name
Installation of Steel Structure for the Falcon Club Building
Work Location
Riyadh – Mulham
Owner/Contractor
Falcon Club Building
Project Name
Installation of Steel Structure for Times Square
Work Location
Riyadh Boulevard
Owner/Contractor
Times Square
Project Name
Installation of Steel Structures and Covering Panels – Buildings C7-C9 for the Medical Evacuation Area
Work Location
Riyadh Airport
Owner/Contractor
Buildings C7-C9 for the Medical Evacuation Area
Project Name
Fireproofing of Steel Structure – Buildings C7-C9 for the Medical Evacuation Area
Work Location
Riyadh Airport
Owner/Contractor
Buildings C7-C9 for the Medical Evacuation Area
Project Name
Installation of Steel Structure for YAMAMH FACTORY